The Golden 1 Center construction currently includes:
  • Installation of the roof solar system
  • Installation of Million Trees panels at exterior soffits
  • Installation of storefront & glazing at exterior north wall of Practice Facility
  • Installation of exterior LED video panel supports at each side of Main Entry hangar doors
  • Installation of LED ribbon board supports
  • Start-up, testing and commissioning of mechanical, plumbing and electrical equipment
  • Installation of interior drywall, texture & painting
  • Installation of metal ceiling systems at Main Concourse
  • Framing, rough-in, and build-out of concession stands and Central Kitchen
  • Installation of low-voltage / telecom / video-production cabling & racking systems
  • Installation of Data Center equipment racks, cabinets and in-row cooling units
  • Installation of casework, countertops and tile at Lofts and Suites
  • Installation of cabinetry, flooring and finishes at Courtside Clubs, Locker Rooms, Star Rooms and other Event Level spaces
  • Installation of glass railings at Lofts, Suites and Upper Bowl
  • Installation of seating in the Upper Bowl
  • Installation of elevators and related equipment
  • Installation of storm and sewer lines from arena to tie-in at 7th & K St.
  • Installation of storm drain tie-in at 5th & J St.
  • Installation of Plaza waterproofing, rebar, formwork and pouring concrete planter walls
  • Curb, gutter and sidewalk replacement work along L St. 

Downtown Commons (Doco) Construction
  • Forming deck in area near 5th & J Street at level 5
  • Placing rebar on deck in area near 5th & J Street at level 5
  • Pouring concrete on deck in area near 5th & J Streets at level 5
  • Raising column rebar in area near the scientology building at level 4
  • Placing forms for columns & walls in area near the scientology building at level 4
  • Pouring concrete for columns & walls in area near the scientology building at level 4
  • Forming and pouring columns behind area facing the scientology building at level 3
  • Forming deck behind area facing the scientology building at level 4
  • Forming deck near arena ramp area at level 3
  • Placing rebar on deck near arena ramp area at level 3
  • Pouring concrete on deck near arena ramp at level 3
Downtown Sacramento Arial view

Golden 1 Center with Downtown  Commons cranes in background 5th & L Streets 

Downtown  Commons construction at 5th & J Streets 

Golden 1 Center with Downtown  Commons cranes in background.
Taken from 555 Capitol Mall, 12th floor looking north.

Golden 1 Center on L Street looking west between 5th & 6th Streets 

Golden 1 Center looking west on K  & 7th Street 

Downtown  Commons construction looking south from 6th Street 

Downtown  Commons construction on J Street looking west. 

Downtown  Commons looking south on J Street. 

Downtown  Commons construction looking south at 5th & J Streets. 

Downtown  Commons construction at 5th & J Street looking South East.  

Downtown  Commons construction at 5th & J Street looking South. 

Downtown  Commons construction at 5th & J Street looking South. 

Downtown  Commons construction on J Street and 5th looking east. 

Golden 1 Center on 5th Street looking south.

Downtown  Commons construction on 5th Street looking North. 

Downtown  Commons construction on 5th Street looking North.

Downtown  Commons construction on J Street looking East.

Downtown  Commons construction looking east from 16 floor of Holiday Inn

Downtown  Commons construction looking east from 16 floor of Holiday Inn

Downtown  Commons construction on J Street & 
6th Street looking south.




















Panoramic view looking north from 12th floor of 555 Capitol Mall

Panoramic view looking east from 16th floor of Holiday Inn.

Panoramic view from 7th floor of parking garage at r & 16th Streets







No comments:

Post a Comment