Friday, October 30, 2020

1130 K Street Renovation

 A top to bottom renovation with two new floors of all glass being built on top. Not sure what city this is, I don't recognize the skyline. Scheduled to be completed in 2022. Up to 200,000 square feet available!


1130 K Street renovation with two new floors being built on top

1130 K Street renovation with two new floors being built on top

1130 K Street renovation with two new floors being built on top

Thursday, October 29, 2020

State Capitol Annex

If you have not heard, back in 2017 a plan was launched to demolish the State Capitol annex on the east side of the building and replace it with a modern office building. In addition, the plan also includes building a private underground garage and underground visitors center. This is a billion-dollar plan at a time the State has a $54 billion deficit due to the impact of Covid-19. Read more in Sactown Magazine where investigative reporting puts a spotlight on this boondoggle with public monies!

In late September, Gov. Newsom said he wants to explore the possibility of 75% of state workers telecommuting after the pandemic ends.

Annex-Collage massing studies
 by Skidmore, Owings & Merrill

Friday, October 16, 2020

Colliers Sacramento Office Research & Forecast Report: Q3 2020

Colliers International is reporting that the Sacramento region’s market vacancy rate increased 10 basis points quarter-over-quarter almost entirely due to more than 136,000SF of vacant sublease space hitting the market. The amount of space companies are planning to give back spiked in the third quarter, of the 431,664 SF of new avable sublease space since the end of March, 286,045 SF of new sublease space hit the market alone in the Q3, a 73% increase in available sublease space in the last six months.

In new construction and forecast, the State of California is under construction on four new office developments totaling over three million square feet with the Richards Blvd. Office Complex representing the largest with 1.25 million SF. Download the report here.




Friday, October 09, 2020

Safe Credit Union Convention & Preforming Arts Centers Construction

Safe Credit Union Convention Center construction - K Street

Both the Convention & Preforming Arts Centers are scheduled to be completed in March of 2021, about a five month delay from the original opening date of October 2020. The estimated $196 million renovation/expansion of the SAFE Credit Union Convention Center will add meeting rooms, exhibit halls and more lobby and kitchen space. At roughly $85 million, the renovation of the SAFE Credit Union Performing Arts Center will enhance the theater’s aesthetic appeal, improve its lobby and make the venue more accessible to disabled patrons. Work also will be done on the theater’s loading dock, which will allow it to host larger shows.

The stretch of 13th Street between J & K Streets looks to be a new dead space where a 60 foot wall now stands. This area use to have both a coffee shop & café and lots of outside seating, but now it appears to be sterile sidewalk... the forgotten west side. Image below to see what I'm talking about.

Safe Credit Union Convention Center construction - 13th Street dead space

Safe Credit Union Convention Center construction - J Street

Safe Credit Union Convention Center construction - corner of J & 13th Street

Safe Credit Union Convention Center construction - 13 Street

Safe Credit Union Convention Center construction - 13th Street dead space

Safe Credit Union Convention Center construction - 13th & K Street

Safe Credit Union Convention Center construction - 13th Street dead space

Safe Credit Union Preforming Arts Center construction - L Street

Safe Credit Union Preforming Arts Center construction - L Street

Safe Credit Union Preforming Arts Center construction - L Street

Safe Credit Union Preforming Arts Center construction - L Street & 13th Street

Safe Credit Union Preforming Arts Center construction - K Street back side





Thursday, October 08, 2020

Hyatt House Hotel Construction @ 2719 K Street

Hyatt House Hotel - 2719 K Street, Sacramento, CA

Adaptive-reuse project of the historic Eastern Star Building that will transition into a Hyatt House Hotel with 128 rooms. An eight-story, 128-room Hyatt House in the historic Eastern Star Hall in midtown Sacramento.

The project is located across from Sutter's Fort State Historic Park. The original building was built in 1928 and three stories. The existing brick façade will remain and a new 8 story hotel will be inserted inside. Cost of construction $26.7 million

https://www.hrgarchitects.com/hyatt-house-sutter-fort

Hyatt House Hotel - 2719 K Street, Sacramento, CA


Hyatt House Hotel - 2719 K Street, Sacramento, CA



Wednesday, October 07, 2020

Fort Sutter Hotel

Fort Sutter Hotel - Sacramento, CA Capitol Ave. & 28th Street

The 105-room boutique hotel in Midtown Sacramento appears to be nearly completed and ready to cater to B-Street Theatre and Sutter Hospital visitors. The hotel will include high ceilings and a fireplace and the design will be reminiscent of a big-city boutique hotel.  The hotel will also be one of the first Tapestry Collection hotels, under the Hilton name, in California. Completion of the project is projected to be 2020. It looks like Restaurateur Randy Paragary has added a nice addition to the neighborhood.

Tuesday, October 06, 2020

‘Swing Space’ Office Building Construction

10th & O Street 'Swing Space' office Bldg. construction


The new 10-story state office mid-rise at the corner of 10th & O Streets in Sacramento has topped out and the exterior skin of the building is nearly completed and wrapped around the structure. IMO, the exterior skin looks much different from the renderings. 

10th & O Street 'Swing Space' office Bldg. construction

10th & O Street 'Swing Space' office Bldg. construction

10th & O Street 'Swing Space' office Bldg. construction

10th & O Street 'Swing Space' office Bldg. construction




10th & O Street 'Swing Space' office Bldg. rendering


Monday, October 05, 2020

Powerhouse Science Center Construction

Powerhouse Science Center construction along the Sacramento River
Construction is underway at the Powerhouse Science Center, a $50 million project is expected to open early 2021 opening along the banks of the Sacramento River.

Powerhouse Science Center construction along the Sacramento River

Powerhouse Science Center construction along the Sacramento River

Rendering of Powerhouse Science Center construction along the Sacramento River

Friday, October 02, 2020

CA Natural Resources Headquarters Construction


Scheduled work plan includes furniture delivery and many other activities. Click here, here & here to access the construction schedule and other important information.







Thursday, October 01, 2020

1215 O Street Office Building Construction



Construction Milestones:
  • Elevator work is in progress
  • Modular Systems Furniture installation has begun on Level 3
  • Site work continues along Neighbor’s Alley and will move to Pedestrian Alley
  • Gas and fire water line tie-ins are in progress
  • Raised access flooring installation is substantially complete Levels 2 through 11
  • Metal stud framing, MEP rough-in and drywall is in progress Levels 8 through 11
  • Installation of Penthouse metal panels is substantially complete
  • Roofing on Penthouse and Main Roof are substantially complete
Design Milestones:
  • Retail space design is in the approval stage
  • Interior graphics package design is in the approval stage
  • Furniture layout reconfigured for post COVID return to work scenario
  • Interior and Exterior art installations are in design with selected artists

    The project is scheduled for completion early 2021.


Wednesday, September 30, 2020

Hyatt Centric Hotel Construction @ 1122 7th St.

Marshall/Hyatt Centric Hotel - 1122 7th Street Sacramento


Work continues on the construction of a new 11 story building built behind the historic 7th and L street facades of the Marshall to be joined with a new tower to be constructed at the site of the Jade Hotel. The new building would be set back from the east and south facades of the Marshall to retain the visual scale of the Marshall facades from the street level. 170 guest rooms along with 5,000 square feet of ground floor retail. The project is estimated to cost $56.65 million. (see Financial Considerations here).
Marshall/Hyatt Centric Hotel - 1122 7th Street Sacramento

Marshall/Hyatt Centric Hotel - 1122 7th Street Sacramento

Marshall/Hyatt Centric Hotel - 1122 7th Street Sacramento

Marshall/Hyatt Centric Hotel - 1122 7th Street Sacramento looking north on 7th Street 


Tuesday, September 29, 2020

Richards Boulevard State Office Construction

 1.3 million sq. ft. state office buildings development that will house several state departments. The ground and foundation work is currently under way with completion in March 2024.
Foundation work for Richards Blvd. State Office - Richards Blvd.

Foundation work for Richards Blvd. State Office - 7th & Richards Blvd.

Foundation work for Richards Blvd. State Office - 7th & Richards Blvd.

Looking south on 7th Street at Richards Blvd.

Rendering of proposed Richards Boulevard State Office Complex

Rendering of proposed Richards Boulevard State Office Complex