Thursday, May 31, 2007

Crocker Art Museum Expansion

Looks like the long anticipated Crocker Art Museum expansion is finally ready to proceed this year. Ground breaking is set for July 26th.

The project is will run about 71.6M, financed by a bunch of different sources

CRCIP: $2M
CA Prop 40 Grant: $2M
Sac County CAMA Grant: $2.5M
SHRA Downtown BOnd: $8M
SHRA Tax Incerment: $1M
CRCIP Loan: $12M
Crocker Art Museum Association (CAMA): $44.1M
Total: $71.6M

The new wing will be named the "Teel Family Pavilion"

Here is a cool rendering from Sactown Mag.
____________________



___________________

....and a couple others from the architects based out of NY, Gwathmey-Siegel.

____________



_________________



_________________

Gwathmey-Siegel have quite a museums under their belt, including the Guggenheim.

This design is much more conventional than the Guggenheim design, not surprising though. I can see how some people in Sacramento would object to something a little too non-conventional given the historical nature of The Crocker and knowing how the preservation community can be on issues like that. The architect even mentioned in the Sactown Mag article how they had a rough go the first time before the design review from preservationists. There was no mention really of what those issues were though,so I don't know I would have sided with.

While I would have liked to have seen something maybe a little more daring, I think it's still a nice looking addition. Clean and straight forward. Most importantly though, once completed in spring 2010, The Crocker will have 100K more worth of exhibit space, cafe, store, meeting rooms and more.

There is a link to the city staff report for what looks like some last minutes details.
Crocker Art Museum Expansion and Renovation Project Staff Report

Wednesday, May 30, 2007

The Crest to become a Performing Arts Center?

I was listening to the K Street streetscape plan this last Tuesday on the city website when something caught my ear. One of the speakers was Jim Brennan, his company are the ones renovating the Atkins Building(?) at 10th and K (NE corner)into office condos and ground floor restaurant space. He said they have also acquired the Kress Building, 920, 924, 930 K Street (which are the 3 buildings on south-west most section of 10th and K) and the most intriguing, The Crest Theater.

He said they are looking to reposition The Crest into a performing arts center.

He's a Juilliard School graduate that has done projects in the Gaslamp, SOMA and says was one of the drivers behind the Louise Davies Symphony Hall in SF, along with work on the Opera House and Ballet Building.

We know The Crest shows a lot of films, speakers, music, comedy, festivals, some live theatre, and other events, but seeing The Crest as a performing arts center as well would be a pretty darn cool thing in my mind.

The main auditorium could be a nice mid-sized venue between the community center theatre, music circus, memorial auditorium, which are too big for most, and places like Thistle Dew or The Geery. An upgrade (I don't mean a major structural change for you preservationists) could maybe allow the main stage to be another midsized venue for more live theatre performances that seems to be really needed in this city.

The only thing I have to go on is what I heard from him speaking for 3 minutes, so there isn't much to go off of. There was no mention of the actual plans or ideas, but I would really like to find out what they are.

I'm very interested to see if they will still keep all the events that currently take place and will be able to make it work for another live performances as well. The other possibly I thought was maybe they were thinking of taking The Crest Cafe that is part of the building and turning it into a small theatre, that seems less likely though.

The only thing I was able to find was something off the Carrier Johnson website that lists "Crest Theater Mixed-Use Development | Sacramento, CA"

The Davies Hall was the work of 15 years of effort in a city with lots of corporate money and wealthy people, along with 5M (1980s money) from Louise Davies, 10M from the city, and other funds from companies and people. Any type of performing arts venue takes a long time to come to fruition in any city, let along a smaller one like Sacramento.

As I have mentioned before, philanthropy has been on the rise over the last few years, let's see if that pays off here.

Friday, May 25, 2007

Saca misses CalPERS buyout deadline

Not surprising given all the buzz recently. I have to imagine another option will be bought and they will keep working it, but a missed deadline is a missed deadline.

The only good news is, everything I have heard says Mohamed and the Saca's are good family friends, so Saca catches a big break there.

"but a real estate investor (Mohamed)who holds the loan for the land purchase said Friday that he has no plans to foreclose on the project."

Nassi and now Saca both keep missing deadlines, we'll see where this all ends up. Over the weekend I drove by the Aura site and they had demolished the remainder of the parking lot. Considering Nassi was just granted another extention, I can't think it's any kind of groundbreaking.

______________________________________________________________________________________

Saca misses CalPERS buyout deadline
Sacramento Business Journal - 2:06 PM PDT Friday, May 25, 2007

Developer John Saca will not meet Friday's deadline to buy out The California Public Employees' Retirement System's $25 million investment in the Towers on Capitol Mall project, Saca said on Friday.

Saca, the managing partner of the project, had worked out a deal last month to pay back CalPERS, which had pledged $100 million overall. The two partners have been at odds on how to proceed under cost overruns that are estimated between $70 and $100 million.

"We're still working on it," Saca said of dissolving the partnership with CalPERS and securing new financing. "We're not going to pull it off today."

CalPERS spokeswoman Pat Macht said there are no provisions to extend the buyout agreement beyond Friday.

"If he doesn't act on his option today and has another idea he wants to come back with, that will be considered," Macht said. Saca likely will have to pay more money for a new option if he pursues one, though Macht declined to discuss any possible terms.

In the meantime, Saca and CalPERS remain estranged partners.

The Towers on Capitol Mall is a 53-story, 800-unit condo development that broke ground last year. Work stopped before the foundation was poured.

Saca indicated earlier this year that the project is $35 million in debt, including a $22 million loan for the land purchase and a owed to contractors who have done site work.

The project has defaulted on that loan, but a real estate investor who holds the loan for the land purchase said Friday that he has no plans to foreclose on the project.

Thursday, May 24, 2007

East End Gateway Update

As you know, I am very big on the 16th Street, so I will try to always update people on anything going on along that street, no matter how big or small.

A couple months ago, CADA choose Ravel Rasmussen for site 3 and SKK for site 2 at 16th and O. With SKK wanting both sites or none, CADA has decided to give both sites to Ravel Rasmussen.

I was unable to attend the meeting, so if anyone has details I'd appreciate any info.

From the agenda on May 18th it looks like CADA and Ravel Rasmussen have entered into a Exclusive Right to Negotiate, but I don't know for how long, but lets hope it doesn't take as long as sites 1 and 4 have with Lambert Development.

From the original proposals, Ravel Rasmussen has proposed about 69 rentals and 13K in retail space.

I really wanted to see some ownership housing on these sites, so let's hope sites 1 and 4 have them. From what I have heard, Lambert Development is doing just that.

The last CADA meeting I attended a couple months ago extended the ERN for site 4 until September, for which they expect to have a DDA in place. Let's hope they are right, but given the slow progress until now, I'll believe it when I see it.

Friday, May 18, 2007

Tower Bridge Pedestrian/Bicycle Improvements Project

The project, which started in January, will take approximately 18 months to complete and will widen sidewalks from an existing 3 feet to 10 feet. The project will enhance pedestrian and bicycle safety, in addition to accommodating future development planned along both riverfronts.









Tuesday, May 15, 2007

Sacramento Metropolitan Arts Commission (SMAC) - Cultural Business Plan

We recently had a discussion around the arts and theater scene in Sacramento. Here is your chance to participate in the future.

Closed mouths don't get fed...take the survey.
______________________________________________________________________________________

The Sacramento Metropolitan Arts Commission (SMAC) is creating a new Cultural Business plan and wants to hear from you. As part of its year-long planning process SMAC is launching two internet surveys: one for the general public, and one for arts organizations and individual artists.

Take the general public arts & culture survey

Take the survey for arts organizations and individual artists

he surveys take only a few minutes to complete and will be used in helping develop the new Plan. To encourage you to take the surveys, SMAC has acquired some “thank you” prizes, including tickets to several of Sacramento’s premiere performing arts organizations. Everyone who completes the survey will be automatically entered in the drawing.

To learn more about SMAC’s business planning process: Click here

Thanks for your time.
Sincerely,
Rhyena Halpern, Executive Director
_____________________________________________________________________________________

- Notes from April 17 Business & Civic Leaders Roundtable notes

- Notes from April 17 Commission-Staff Retreat notes


- Notes from April 17 Multicultural Artists and Culturally Specific Arts Organizations Roundtable

-Notes from March 12, 2007 Commission-Staff External Environment Exercise

- Notes from March 12, 2007 Commission-Staff External Environment Exercise

- Notes from March 12, 2007 Cultural Arts Awards Grantee Town Hall Meeting

Saturday, May 12, 2007

10th and K Progress

A few months ago we heard that the old Woolworth Building would contain a cabaret theatre venue for the California Musical Theatre, along with a (Carnegie Deli style, yum!) restaurant and lounge by Paragary for phase I of the project by Taylor and the CIM Group. If you have walked by the site recently you can see the building boarded up (well more boarded up than it used to be) with interior demo taking place.

Phase two was going to be a 14-story 130 unit mixed use building on the remaining site, looks like that number has jumped up based on Bob Shallits latest column to 21 stories and 158 units.

CIM and David Taylor are hoping to have the DDA in place by December and thus acquire the 3 remaining parcels at 10th and K that the city has own for 10 years or so. Previous attempts at development over the years included a huge multiplex, a California News Station start up, an Old Navy, and most recently before this a CineArts Theatre.

This is a pretty darn solid team though. Taylor has completed a lot of buildings in downtown and CIM is a deep pocketed national developer with many projects under their belt, including 800J here in downtown. PLUS they have their own financing arm of their company that makes financing pretty easy for them.

The building across the street the rest of article mentions is also undergoing renovation. I've always found that building kinda interesting, but not really in a good way. It's an odd looking building with very few windows. Seems like that would be a draw back to some potential buyers, but then again being so close to the Capitol is a big advantage.

Pieces are slowly coming together on K Street. The addition of Ella's in the new Cathedral Building, along with these projects should add some foot traffic and synergy to the area. I still want to see another small theater somewhere on K Street though. There was also talk of KHTK locating on the 1100 or 1200 block. I'm sure Imax, Pyramid Brewery (GOOD beer, eh food), The Crest (old faithful), Ambrosia (good, but could be so much more), Chops (pretty good steaks) and others are counting the days down. I personally really want to see the marquee the new theatre will have. I love those things!

Now if the city can just get the 700 and 800 block out of the courts...

__________________________________________________________________________________

Bob Shallit: Condos join plan for 10th, K revival
By Bob Shallit - Bee Columnist

Developers working on a cabaret and restaurant complex at the corner of 10th and K have even bigger plans for three adjacent parcels: They want to build a 21-story condo tower there.

The developers -- David S. Taylor Interests and the CIM Group of Los Angeles -- have an exclusive right to negotiate with the city for the three parcels, on the south side of K Street between 10th and 11th.

If a just-launched environmental study finds no serious problems, Taylor and CIM hope to sign a development agreement and acquire the parcels in December, says Elle Warner, a VP with Taylor Interests.

Early plans, from architect WRNS Studio of San Francisco, call for a "green" building with 158 for-sale units, Warner says. Most would be about 900 square feet but larger penthouses would occupy the top two floors. No prices have yet been set.

Other downtown condo projects have run into financing problems. But Warner says her group is optimistic.

"There's never been a question about demand," she says. "It's really about putting it all together."

At some point, she adds in reference to the prospects of downtown housing taking off, "the stars will line up."

* * *

Taking off: Meanwhile, work has begun on the cabaret project at the southeast corner of 10th and K -- and at an office condo project on the key intersection's northeast corner.

Removal of hazardous materials began three weeks ago at the future cabaret site, formerly the Woolworth building. The hope, Warner says, is to begin construction this summer on a 200-seat venue for the California Musical Theatre along with a restaurant and lounge to be run by Randy Paragary.

Across the street, at 1001 K, interior demo work is nearly done and the Trancas Fund of St. Helena soon will be launching a building rehab and facelift. End result: Five stories of office condos above a first-floor restaurant, says Jerry Fournier, regional manager for project contractor J.B. Olsen.

City officials have tried for years to spark development at 10th & K. Amazingly, it's finally happening.

Monday, May 07, 2007

Streetcar Update

I love walking, but everyone in a while it's nice to get a lift.

Central City Opinion and I received an email asking us to spread the word about the upcoming city council meetings regarding the Streetcar Feasibility.

- City of West Sacramento Council Meeting: May 9th
- Presentation to RT and Yolo County Transportation District: May 14
- City of Sacramento Council Meeting: May 22

Central City has started a discussion on the subject and raises lot of good questions. Head over there now and give your impute.

This is a very important topic on the future of transportation within the central city and West Sacramento. As we see more and more development with the central city and West Sac, we need to have a more efficient way to get people from one place to another for sort trips without having them get in their cars. Light Rail is good for longer trips, but Streetcars similar to Portland Streetcars work great for shorter distances.

Central City Opinion Streetcar Discussion


">Link to Streetcar Feasibility Study

Sunday, April 29, 2007

Sacramento Museum of Art, Science, and Human Perception

I stumbled onto this and thought I would put it out here for people to see.

Sacramento needs more big time museums and exploratoriums, and I think the old PG&E is a perfect location for one. Close to Old Sac and downtown, right on the river, next to the water intake and accompanying water feature, and right by new park area.

As I commented a while ago, I think old buildings like these make for great public and civic spaces. I really like the Riverfront Pavillion, cafe and store in the site plan. It also looks like part of the site will be reserved for a future project, possibly for a residential tower in the future, but will be used for parking in the meantime.

I remember that when the city was requesting proposals for the site a while ago, Mike Heller proposed turning the building into a museum that would hold the collection of the Wayne Thiebaud family, which I thought was a nice idea at the time, and still think something along those lines would be a great addition to the city.

I know Sacramento has many other smaller history places like The California History, Womens, Military, Wells Fargo, Discovery, Towe, Aviation and others I am sure I'm forgeting, but The Crocker and The Railroad Museum are places that I think are on another level from the other places mentioned, and I'd like to see more at this level.

The Crocker is about to go through a huge expansion that has taken a lot of years to fund and materialize. I have to imagine something like this would cost a ton of money and a lot of time to put together as well.

Philanthropy has been increasing at a brisk pace over the last few years in Sacramento, lets see how that trend possibly helps this.

The Sacramento Children's Museum seemed to have some momentum going a short time ago, but nothing new has come out recently other than apparent frustrations by the the organizers.

______________________________________________________________________________________

Sacramento Museum of Art, Science, and Human Perception (SMASHp)

Modeled on San Francisco’s highly respected and hugely popular Exploratorium. SMASHp will be a publicly-owned science museum located in the old PG&E Building on the Sacramento River. SMASHp may be inspired by the Explortorium but it's own exhibits will be modeled on science museums from around the world. And many of the exhibits will be created by visual and performing artists as well as scientists and educators thus creating an unique environment that will stimulate the senses and appeal to people who are not normally turn-on by science.

The former Pacific Gas and Electric Co. building, next to the new Jibboom Street Park, is currently vacant and the city is looking for someone to rehabilitate of the historic building for commercial and/or community use. We propose transforming it into a unique 21st-century science museum. The building’s Renaissance/Baroque ornamentation provides a museum-like quality and in some ways recalls the Palace of Fine Art Building in San Francisco which houses the Exploratorium.

The historic building made of reinforced concrete has a large open interior space that is ideal for a wide variety of scientific exhibits. Natural light will filter through skylights and windows to illuminate the interior during the day and the building will be dramatically lit at night.

The museum's entrance will be through the neo-classical portal on the west side (riverfront) of the PG&E building. The western orientation will increase activity along riverfront and as the Railyards Project Area is developed the wisdom of this orientation will be further reinforced.

A small but architecturally striking pavilion will be constructed northwest of the museum's entrance and will house the museum’s store and café which will have outside terraced where visitors will be able to dine alfresco while overlooking the Sacramento River.

Several specially landscaped spaces throughout the site will include ‘smart art’ pieces.

The area north of the museum will be reserved for a future museum tower –a mix-use residential high-rise, however, until that time the site will be used for museum parking.

The Sacramento Museum of Art, Science and Human Perception is destined to be the one of Sacramento’s most popular tourist destinations- attracting many people to the area each year and energizing the existing Sacramento River Parkway trail that connects Old Sacramento to Discovery Park and helping to make the Sacramento Riverfront truly world-class.

How will SMASHp be financed?
Corporate Donors
Public Utility
City and County of Sacramento
University of California
State and Federal

Wednesday, April 18, 2007

Studios for the Performing Arts

Studios for the Performing Arts
14th and H Street (Empty lot next door to the Music Circus)

5 Stories - 48,000 square feet of rehearsal, office, and classroom space for The Sacramento Ballet, Sacramento Opera, Sacramento Philharmoic Orchestra, and California Musical Theatre.

The project is ~25M, with 9M coming from the city (money from the CIP done last year), 5M loan, and 11M in donations.

Project is currently under going 11.5M fund raising efforts. Project is expected to be completed in 2 years. From what I understand the lease run out for the Ballet school in 2 years, so they need to have the space ready by then.

Here is how the major donor requests break out:
Lead Donor: $5M Requested: Naming Rights (They said this one is imminent)
Ballet School Naming Rights: $1.5 - 2M
Studio One Naming Rights: $1 - 1.5M
Studio Two Naming Rights: $1 - 1.5M
They have also raised 550K (at time of the last council report) in pledges from other donors.





Monday, April 16, 2007

Saca buys out CalPERS

I heard this was coming anytime now, but with so many rumors about the project it's hard to know what is true or not. I even heard that CalPERS only got the 25M back with no return, I have no way to verify if it is true or not though.

From the tone of the article is sounds like the new partner(s) are just around the corner. Saca seems to keep pushing back the obstacles on this project, even if it is taking longer that he hoped. The current obstacle would have to be getting those new contracts signed, 250 seems like a nice start, and getting the new equity partners signed.

From what I understand Joe Mohamed and Saca have known each other for years and land under default is not an issue. Given the timing of when Mohamed bought the note on the land right before it went into default, that sounds like a believable rumor..maybe we see him jump in as part of the new team of investors.

I am still concerned about more cost increases though. If it was 70M over budget a few months ago, it could be more by now. There was an article a little while ago about him locking in some prices, but I'm not sure if that is still the case.

EDIT: MORE INFO -
This latest Bee article sounds like CalPERS will only get the 25M back I mentioned above. Not a done deal yet though.
http://www.sacbee.com/103/story/155909.html
"Saca has until May 25 to come up with about $25 million needed to reimburse CalPERS for the money it had spent on the project before construction stalled earlier this year."
_____________________________________________________________________________________

Saca buys out CalPERS stake in Towers project

Sacramento Business Journal - 2:59 PM PDT Monday, April 16, 2007
by Michael Shaw

Developer John Saca has bought out California Public Employees' Retirement System's interest in the Towers on Capitol Mall skyscraper project, allowing him to retain ownership and search for other partners, Saca said Monday.

Terms were not disclosed.

The move may allow the project to move forward if additional financing can be found to cover increased construction costs and to replace CalPERS' $100 million contribution. Although CalPERS did not disclose its financial involvement to date, sources familiar with the project had previously said it had contributed $25 million before work stopped in January.

The two sides butted heads on how to proceed under overruns estimated at least $70 million. Saca said they had reached an "amicable settlement."

The split comes a year after the pension giant announced its intention to invest in the condo towers, with officials calling it "a good investment." Saca called the partnership "a perfect match" at the time.

The relationship soured, though, after it became apparent that the original budget of $500 million wouldn't be enough to build The Towers. Personnel changes at CalPERS may also have played a role -- a strong backer of the project, Mike McCook, left the role of senior real estate investment adviser.

The foundation has yet to be poured and The Towers already owes about $35 million in loans to contractors for work already done. Unpaid contractors have filed liens and lawsuits against the project.

Real estate investor Joe Mohamed purchased the $22 million loan from First Bank that the Towers partnership used to purchase the land on Capitol Mall.

Saca said Monday he is working with Mohamed to pay off the loan or extend it.

Saca said he hoped to be able to pay remaining debts within a few weeks.

"We are working hard to bring in another partner and hope to have a new deal announced within a week or so," Saca said in a news release.

Saca said more than 250 condo buyers have signed agreements that extend deadlines for completion of the project.

"CalPERS has been fair and reasonable coming to this settlement," Saca said. "Neither party foresaw the significant changes in circumstances that have affected this project."

"Over the last several months, I have been inspired and humbled by the hundreds of supportive phone calls and e-mails from citizens all over the Sacramento area," Saca wrote. "They believe in this project; our buyers believe in this project."

The Towers consists of two 53-story towers with 800 condo units and a 230-room InterContinental Hotel.

Monday, April 09, 2007

Midtown Rundown

Here's a few pictures from two of midtowns biggest construction projects.


Sutter Medical Center Expansion




Capitol view from 17th Street


L Street Lofts


L Street Lofts from the alley.


L Street Lofts on L Street.

Our City

Friday, April 06, 2007

831 L Street High-rise Alternatives

For about a year now this project has been slowly moving through the planning process and is still in the early proposal stages with the city. The corner of 9th and L Street is where this tower is being proposed and it still has not been determined weather it will be a residential tower or an office tower.


This is what the current design would be if the residential tower were built. The buildings height would be 150 ft with 173 units, 222 bedrooms, and 219 parking spaces. The 15 floor high-rise would have a total of 343,300 sf. with 6,500 sf of retail and 241,050 sf for residential. A dinning terrace would bump out onto L Street with 1090 sf for tables and chairs.


View from corner of 9th and L Street.


This is what the current design would be if the office tower were built. The buildings height would be 150 ft with 316 parking spaces. The 12 floor high-rise would have a total of 325,200 sf. with 6,500 sf of retail and 190,200 sf for offices. Just like the residential proposal, a dinning terrace would bump out onto L Street with 1090 sf for tables and chairs.


Corner or 9th & L Street.

The ground floor plans for the office and residential plans are very similar.

Overview of project site.

Thursday, March 29, 2007

A Letter from John Saca

Dear Future Homeowner,

I would like to thank-you for your continued patience over the past few months and for your commitment to The Towers on Capitol Mall. Your support via e-mails, phone calls and letters has been overwhelming and validates all of the hard work and effort that has gone into The Towers. You, the Buyers, are ultimately what will make this project a reality. Please know that we have been working diligently to resolve the issues stalling the project and we remain dedicated to building the vision we all share. The Towers continues to receive tremendous support from City leadership because they realize there is no single project as important or as pivotal to the growth of Downtown Sacramento as ours.We are in discussions with several potential equity partners and hope to make an exciting announcement soon regarding the revival and immediate continuation of our project. In order to give us the flexibility and time we need to finalize the necessary financing for the project and resuming construction, we respectfully request that all buyers cooperate with us and agree to the attached addendum. The enclosed Addendum asks that you agree to restate the effective date of your agreement to May 1, 2007 and extends the date for removal of the construction financing contingency (found in Section 6 of your purchase agreement) to August 31, 2007. Upon signing the attached Addendum your contract remains in force and fully binding. Failure to execute this Addendum within the time set forth below, could result in cancellation of your contract and return of your deposit. Therefore, your timely cooperatio n is necessary and greatly appreciated. Thank you in advance for continuing to share my vision and being willing to stand by The Towers through all of the ups and downs that any project of this size and significance would face. Please click here to print out and sign the Towers Extension Addendum and return it to the Sales Office at 455 Capitol Mall, Ste#135 Sacramento, CA 95814 on or before April 17, 2007. We have also sent this information via regular mail with a pre-paid addressed envelope. Feel free to contact The Towers Sales Team at (916) 443.2200 if you have any questions or concerns regarding this matter. The Sales Office is open Tuesday through Saturday from 9AM to 5PM.

Again, I sincerely appreciate your cooperation, support and dedication to The Towers and being a part of this historical, world-class building.

Sincerely,
John Saca President, Towers on Capital Mall, LLC.

-------------

After I read this letter to the future home buyers, it secured my belief that the Towers will be built as originally proposed. It also let me know that my sources of info on the towers have been right on the money.

The only thing that I see that might be another set back is if not enough buyers’ sign the Towers Extension Addendum and choose to back out of the deal this way. They were only 13 away from the magic 50% mark about a month ago.

Friday, March 23, 2007

New Developers for East End Gateway

Today CADA selected SSK Development (Kolokotronis)and Ravel Rassmusen for the two sites. They approved a 60 day ERN for:

SSK to develop 70 condos and 7,300 retail in what seemed to be a 7 or 8 story building on site 2. Architect is Ankrom Moisan, who did Fremont Mews and L Street Lofts.

For site 3, 45 apartments and 7,200 retail on 4-5 stories. Architect is Chong Partners

Both developers wanted both sites. So it sounded like we may even see the selection change during the ERN to allow one to do both. Kolokotronis was very adamant about wanting to break ground by mid-next year. He said he didn't want to still be working on this project 4 years from now.

He has been vocal in the past about how long it takes to get projects done in downtown and midtown. Hopefully the same thing that happen with L Street Lofts, which happened very fast, can happen on 16th Street as well

CADAs top priorities for these sites were speed, home ownership and density. The sites are clean and ready to go, so they want them filled right away. They mentioned how there has been a lot of public input for more density on 16th Street, thus the selection of SSK for site 2. I couldn't agree more for site 2. Site 3 which is closer to Stanford Park Homes is probably a better place for the smaller building that Ravel is proposing, thus a good choice there as well.

Other interesting notes I took from the meeting:
CADA hopes to have a DDA in place with Lambert Development in 6 months for site 4 at 16th and P for 40 housing units, retail and underground parking.

For site 1, Lambert is working with Otto Construction on a mid-highrise for 16th and L, with an associated city parking garage.

Lambert made an interesting comment when he spoke. He made mention that even though Aura and The Towers have been having problems and may not happen, it has shown lenders that there is a market for these type of projects and what people are willing to pay for them. It sounded like they had a good beat on financing for the two projects.

It was made pretty clear in the meeting that this would be the last change Lambert has to put the deal together before CADA moves onto another developer though.

I also got the impression that Capitol Lofts is very close to not happening though. It has really run into a lot of budget problems from the sound of it. What a waste of 8 years if that is the case.

Thursday, March 22, 2007

"Coolness in Crystal Ice"

Frequests commenter Wburg has some great photos inside the Crystal Ice building at 16th and R, on his blog Sacramento History

The building is marked for an amazing transformation by Mark Freidman into housing and retail, "The Ice Blocks", along with a pedestrain walkway with festivals, walking, outdoor eating, street venders and markets. Go check out the great photos he has up.

Here are some other old photos I found online.