Friday, October 30, 2015

Golden 1 Center Construction Photos

Current work being done on the arena includes installation of rebar for elevated concrete deck pours at Main Entrance. Installation of raker beams in the lower bowl to support lower bowl concrete stadia. Mechanical, electrical, plumbing and fire protection rough-in. Installation of the upper bowl HVAC ductwork. Interior metal stud wall framing. Interior drywall installation at mechanical and electrical rooms. Exterior metal stud wall framing at low roof parapets. Installation of exterior façade metal panel and glazing systems. Installation and connection of underground utilities at L and J Streets. Under-slab plumbing and rebar installation for event level slab pours. Installation of roofing at the Practice Facility and arena low roof. Source

Golden 1 Center Construction seen from the 12th floor of 555 Capitol Mall

Golden 1 Center Construction seen from the 12th floor of 555 Capitol Mall

Golden 1 Center 5th & L Street

Golden 1 Center 6th & L Street

Golden 1 Center at 7th & K Street

Golden 1 Center at 5th Street

Golden 1 Center 5th & L Street

Golden 1 Center 5th & J Street

Golden 1 Center 5th & J Street

Golden 1 Center at J Street

Golden 1 Center at J Street

Golden 1 Center from Embassy Suites on Capitol Mall

Sacramento skyline seen from Yolo Bypass Wildlife Area

No comments: