- Raising rebar columns in area near 5th street at level 2
- Forming columns for wall in area near 5th street at level 2
- Pouring concrete for columns on deck arena near 5th street at level 2
- Pouring concrete for slab on deck near the scientology building at level 2
- Placing columns on deck near the scientology building at level 2
- Pouring concrete on deck behind area facing the scientology building at level 2
- Placing rebar on deck near arena ramp area at level 2
- Pouring concrete for slab on deck near arena ramp area at level 2
- Pan Pacific Installation of 18” pipe supports
- Striping Deck forms