Golden 1 Center with Downtown Commons cranes in background 5th & L Streets |
The Golden 1 Center construction currently includes:
- Installation of the roof solar system
- Installation of Million Trees panels at exterior soffits
- Installation of storefront & glazing at exterior north
wall of Practice Facility
- Installation of exterior LED video panel supports at each side
of Main Entry hangar doors
- Installation of LED ribbon board supports
- Start-up, testing and commissioning of mechanical, plumbing
and electrical equipment
- Installation of interior drywall, texture & painting
- Installation of metal ceiling systems at Main Concourse
- Framing, rough-in, and build-out of concession stands and
Central Kitchen
- Installation of low-voltage / telecom / video-production
cabling & racking systems
- Installation of Data Center equipment racks, cabinets and
in-row cooling units
- Installation of casework, countertops and tile at Lofts and
Suites
- Installation of cabinetry, flooring and finishes at Courtside
Clubs, Locker Rooms, Star Rooms and other Event Level spaces
- Installation of glass railings at Lofts, Suites and Upper
Bowl
- Installation of seating in the Upper Bowl
- Installation of elevators and related equipment
- Installation of storm and sewer lines from arena to tie-in
at 7th & K St.
- Installation of storm drain tie-in at 5th & J St.
- Installation of Plaza waterproofing, rebar, formwork and
pouring concrete planter walls
- Curb, gutter and sidewalk replacement work along L St.
Downtown Commons (Doco) Construction
- Forming deck in area near 5th & J Street at level 5
- Placing rebar on deck in area near 5th & J Street at
level 5
- Pouring concrete on deck in area near 5th & J Streets at
level 5
- Raising column rebar in area near the scientology building
at level 4
- Placing forms for columns & walls in area near the scientology
building at level 4
- Pouring concrete for columns & walls in area near the scientology
building at level 4
- Forming and pouring columns behind area facing the scientology
building at level 3
- Forming deck behind area facing the scientology building at
level 4
- Forming deck near arena ramp area at level 3
- Placing rebar on deck near arena ramp area at level 3
- Pouring concrete on deck near arena ramp at level 3
|
Downtown Sacramento Arial view |
|
Golden 1 Center with Downtown Commons cranes in background 5th & L Streets |
|
Downtown Commons construction at 5th & J Streets |
|
Golden 1 Center with Downtown Commons cranes in background. Taken from 555 Capitol Mall, 12th floor looking north. |
|
Golden 1 Center on L Street looking west between 5th & 6th Streets |
|
Golden 1 Center looking west on K & 7th Street |
|
Downtown Commons construction looking south from 6th Street |
|
Downtown Commons construction on J Street looking west. |
|
Downtown Commons looking south on J Street. |
|
Downtown Commons construction looking south at 5th & J Streets. |
|
Downtown Commons construction at 5th & J Street looking South East. |
|
Downtown Commons construction at 5th & J Street looking South. |
|
Downtown Commons construction at 5th & J Street looking South. |
|
Downtown Commons construction on J Street and 5th looking east. |
|
Golden 1 Center on 5th Street looking south. |
|
Downtown Commons construction on 5th Street looking North. |
|
Downtown Commons construction on 5th Street looking North. |
|
Downtown Commons construction on J Street looking East. |
|
Downtown Commons construction looking east from 16 floor of Holiday Inn |
Downtown Commons construction looking east from 16 floor of Holiday Inn
|
Downtown Commons construction on J Street &
6th Street looking south. |
|
Panoramic view looking north from 12th floor of 555 Capitol Mall |
|
Panoramic view looking east from 16th floor of Holiday Inn. |
|
Panoramic view from 7th floor of parking garage at r & 16th Streets |